![]() The current bridges will be replaced as part of the Hampton Roads Bridge-Tunnel Expansion project. What will happen to the existing marine bridges? ![]() Crews have constructed a temporary marine bridge to maintain traffic flow, while they demolish a portion of the existing bridge to build the new permanent structure in its place. More specifically for this traffic shift, phases are required for the construction of the marine trestle bridges to accommodate the narrow construction work zone. In order to adhere to these items the project must be approached in stages. Constructing the project within the existing VDOT right-of-way so that there are no impacts to any properties. The HRBT Expansion team has committed to Maintaining two travel lanes in each direction during peak times. Please pay attention to the digital message signs for important messages. It is important that all drivers are patient, obey posted speed limits and drive distraction-free. ![]() With the new future bridge connecting to the South Island at the same point as the current bridge, bridge construction must be completed in phases to accommodate VDOT’s commitment to maintaining two lanes of travel during peak hours. Steel piles are well suited for heavy traffic loads, while also making it easier for crews to remove the temporary bridge once traffic is shifted to the permanent bridge. The temporary bridge is constructed with steel piles as part of the foundation. When construction on the new permanent bridge is complete, traffic will shift onto the new bridge, and the temporary bridge will be removed. Both lanes of traffic on I-64 East will shift to the left onto a temporary marine bridge upon exiting the tunnel. This temporary bridge will allow crews to demolish a portion of the existing bridge to build the new permanent structure in its place. Motorists traveling on I-64 East (towards Norfolk) should anticipate a shift in traffic at the Hampton Roads Bridge-Tunnel starting on Sunday, February 19. The HRBT Expansion Project reaches a crucial marine milestone with the completion of a temporary bridge, allowing construction to begin on a new, permanent structure.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |